Skip to main content
IT

Teesside Gas Plant

Key facts

  • Owned by ‘North Sea Midstream Partners’ and operated on their behalf by ‘px Group’
    20” pipeline links from the INEOS Breagh field to the Teeside Gas Processing Plant (TGPP)
  • Teeside Gas Processing Plant (TGPP) processes gas from two catchments, the Central North Sea and Breagh Area
  • Breagh Area gas is processed via a dedicated train, commissioned in 2013, with a capacity of 225 MMscf/d and potential to increase if required
  • Services provided by TGPP include liquid separation, condensate extraction, dew pointing, MEG supply and regeneration and remote operation of the offshore facilities