Skip to main content
ES

Mobile

ineos-site16.jpg

At a glance

Products

Acetone
Phenol

Personnel 125
Total volume 908 kt

Per annum

The Mobile, USA production facility started-up in April 2000 with an initial capacity of 400,000 te/a. 

Over the years we have invested in the site and have broken numerous production records, so much so that the current capacity is in excess of 540,000 te/a, which is the largest single train Phenol facility in the United States and the second largest in the world. The plant is located on the Gulf Coast of Alabama with its’ excellent transportation networks and access to competitive raw materials and utilities.

Our facility is equipped with world class safety systems providing a high level of security to its employees, the community, and the installation. It utilises state of the art environmental controls enabling best in class environmental standards.

Through our North American customer service centre, which is based in Mobile, we strive to consistently provide a high level of quality and service to our customers. Our goal is to supply the right quality first time, all the time. To achieve this goal, we utilise a quality system that is certified to the ISO-9001standard. The Mobile facility serves customers in the NAFTA, South American, and Asian markets with shipments via tank truck, railcar, barge, and ship.

The Mobile facility is an example of INEOS Phenol’s continued focus on being the global leader in Phenol and Acetone production. The capacity, design, and location provide the reliability and cost structure for us to be highly competitive.

We are confident that our dedication to our customers, employees, and community, will provide continued success in the future.

General contact

7770 Rangeline Road
Theodore
Alabama 36582
USA
+1 251 443 3000

Get directions
Mobile location map