Location |
From Elgin/Franklin and Shearwater to the Northern Spurline |
Description |
The 24-inch diameter 38km long Southern Spurline runs from a SubSea Isolation Valve assembly (SSIV) 250m from the Elgin Platform via a wye (the Southern Spurline wye assembly) located 2km from the SSIV to the wye on the Northern Spurline. A further wye (the Shearwater wye) is located adjacent to the Southern Spurline wye assembly and gives a connection to the Shearwater platform 8km away. The Shearwater wye has a spare leg available to future connections. |
Owners |
- INEOS - 30.500000%
- Eni - 15.197565%
- One-Dyas - 1.520313%
- EFOG - 7.228005%
- NEO - 3.040625%
- Premier - 13.42045%
- Ithaca - 4.2308%
- Total - 24.86223%
|
Export Routes |
Export from the Southern Spurline to the Northern Spurline and then to FPS and Oil tanker loading of Forties Blend at Hound Point (Firth of Forth) and raw gas delivery at Kinneil. |
Maximum Capacity |
Capacity will vary depending on the properties of the commingled liquids and the relative proportions of liquids flowing through the Northern and Southern Spurlines. The approximate capacity of the Southern Spurline is 416 mbpd. |